Withdrawal Capacity and Injection Heat Maps

Learn how Paces builds Withdrawal and Injection Heat Maps, what regions they cover, and how to find and read capacity by substation on Map and in Search.

Written by Claire Quinn

Table of Contents

What are Injection and Withdrawal Capacity Heat Maps?

Paces Injection and Withdrawal Heat Maps visualize estimated injection (power export) and withdrawal (power import) capacity for a transmission bus or tap. They help infrastructure developers understand how much additional power the grid can absorb or deliver at specific substations.

These are especially valuable for the following development types:

  • Data Centers – checking if a site can support large import/off-take loads

  • Battery Energy Storage Systems (BESS) – checking if a site can support large import/off-take loads

  • Utility-scale Solar/Wind – checking if a site can support new generation


Methodology

How does Paces produce withdrawal heat maps?

Paces runs power flow simulations on CEII (Critical Energy/Electric Infrastructure Information) planning cases published by utilities and ISOs. Each dataset corresponds to one case, identified by year and season, such as Summer Peak 2031.
​
Every region includes at least two study years, so you can choose the case that matches your expected in-service date.
​

Cases differ in their queue assumptions. Some include every queued project, which is more conservative. Others only include projects with signed agreements, which is more optimistic.

💡 Because Paces dispatches the system first and then includes N-1 checks, our withdrawal numbers reflect how a real grid responds to new load under realistic, N-1 conditions.

Calculating Capacity

For each substation, Paces:

  1. Adds load at the substation

  2. Redispatches the system – adjusts which generators run and how hard they run to accommodate the new load, as a real grid would

  3. Tests N-1 contingencies – checks the failure of any single grid element

  4. Increases the load until a thermal limit is violated and network upgrades would be triggered

  5. Records that value as the Withdrawal Capacity for the substation

Mapping buses to substations

Grid models identify buses by internal ID with no location attached. Paces matches each bus to a real substation using its own substation dataset, so capacity appears at a location you can view on Map.

Refresh cadence

Paces refreshes Withdrawal Heat Maps when utilities and ISOs release new planning cases. Each region publishes on its own schedule (annual, semi-annual, or quarterly).

Which regions and study years are available?

Every region is on the new methodology and has at least two study years available:

Region

Study years

MISO

2028, 2031, 2036

ERCOT

2028, 2031, 2033

SPP

2028, 2031, 2036

PJM

2031, 2034

SERTP (Duke Energy Carolinas, Duke Energy Progress, Southern Company, TVA)

2028, 2031, 2036

WECC

2031, 2036

Note: MISO, ERCOT, SPP, PJM, and SERTP are built on current 2026-cycle planning cases. WECC is on the new methodology but a prior planning case; the WECC case refresh is in progress.

🔥 Heat maps are a screen, not a study. They are built from utility planning cases, which do not reflect the true live state of the network, and the methodology is deliberately simpler than a power flow study. Heat maps do not reflect all system conditions and are most useful for narrowing a list, prioritizing sites, and comparing capacity across locations.

🧠 When a specific POI matters, we recommend requesting further services for a Power Flow Analysis.


Injection Heat Maps (FERC Order 2023)

FERC Order 2023, affirmed by Order 2023-A (effective May 2024), requires every FERC-jurisdictional transmission provider to publish a public, interactive Injection Heat Map. The map shows estimated injection capacity, in MW, at each bus under N-1 conditions, based on the provider's most recent cluster study. Providers are expected to refresh these within 30 days of each cluster study or restudy, roughly three times a year.

Paces collects these published maps and hosts them as public datasets, so you can check injection capacity alongside your other grid layers.

Note: This data comes from the transmission provider, not from Paces power flow analysis. It's illustrative, non-binding, and thermal-only (no voltage, stability, or short-circuit analysis), and it isn't an offer of service.

Coverage

  • Available: California Independent System Operator (CAISO), Duke Energy Carolinas (DEC), Duke Energy Progress (DEP), Duke Energy Florida (DEF), MISO, NYISO (New York Independent System Operator), Southern Company (SOCO), and TVA (Tennessee Valley Authority).

  • Not available: PJM and SPP. Neither publishes a per-POI capacity number Paces can collect directly.

  • Generally excluded: ERCOT, municipal utilities, cooperatives, and federal power marketers such as BPA (Bonneville Power Administration) and WAPA (Western Area Power Administration) are outside FERC jurisdiction and not required to publish these maps. TVA publishes one voluntarily.

Reach out to your CSM or support@paces.com if there is a publicly available map you'd like integrated into the Paces platform.


Finding Withdrawal and Injection Heat Maps in Paces

How are the maps delivered in Paces?

Injection Heat Maps are public and available to all Paces users in the FERC Injection Heat Maps folder. Withdrawal Heat Maps are available to organizations with heat map access.

Each utility/ISO planning case (Withdrawal Heat Maps) is published as a private custom dataset, named for the region, case, and study year (ex: PJM Withdrawal Capacity - RTEP26 Summer Peak 2031), so users can:

  • Find substations or taps with the most available capacity

  • View substations on map, with infrastructure overlays

  • View site lists to filter and triage top sites

  • Compare study years to match your in-service date

Reach out to your Customer Success Manager or support@paces.com to add Withdrawal Heat Maps to your team's plan

Adding a heat map to your Map View

  1. Navigate to Map.

  2. Select the + icon to open the Map Layers panel.

  3. Search for the region or provider you want (for example, PJM Withdrawal Capacity or Duke Energy Carolinas), or browse the FERC Injection Heat Maps folder.

  4. Toggle on the dataset for the case and study year you want, then select Add to map.

  5. Select any substation or bus to view more details.

Note: You can also find these datasets in the Data Portal.

Heat Map Term Glossary

Field

Description

Min/Max Voltage (kV)

Standard line-to-line voltage levels evaluated for this grid asset.

Owner / Operator

Utility responsible for owning and operating the grid asset.

Withdrawal Capacity (MW)

Estimated amount of load that can be added at this substation, after redispatch, before an N-1 thermal limit is violated and network upgrades would be triggered. This value drives the heat map color for this POI. A value of 0 means the model shows no headroom at this location under the planning case.


Frequently asked questions

Why did my withdrawal numbers change? Two things changed at once: the new engine and current planning cases. Most values moved up, because the prior method was structurally conservative. Check the dataset name to confirm which case and year you are viewing.

Why does ERCOT look so dark? Pre-existing overloads aren't excluded, which is consistent with ISO methodology. A dark area signals existing constraints, not that no capacity exists anywhere in the region.

Is this capacity actually available, or already committed? Every heat map is an approximation, ours included. Values are built off the utility's published planning case, which does not reflect the true live state of the network or the current interconnection queue. To find capacity at a specific POI, request a power flow study.

Can I still access the old maps? Yes, for a transition period. Your CSM can help you move active sites onto the new datasets.


Changes to Withdrawal Heat Maps (September 2026)

If you've used Paces Withdrawal Heat Maps before, this section explains how the current version differs from the previous version. The previous datasets remain available for a limited time transitionary period.

Previous version

Current version

Method

Tested grid failures (N-1) without letting generation respond to new load

Lets generation respond to new load (redispatch), then tests grid failures (N-1)

Planning cases

Earlier planning cases

Current planning cases in most regions (WECC refresh in progress)

Study years

One per region

At least two per region

Capacity fields

Min Withdrawal Capacity and Max Withdrawal Capacity

One Withdrawal Capacity (MW) field

Limits reported

Thermal-limited and voltage-limited capacity

Thermal-limited capacity

Substation coverage

Fewer substations with a capacity value

More substations, from improved bus-to-substation matching

What this means for you

  • Expect values to change. Because the method and the planning cases were updated together, most substations show higher and more accurate withdrawal capacity than before.

  • Confirm which version you're viewing. Current datasets include the case and study year in the name, for example PJM Withdrawal Capacity - RTEP26 Summer Peak 2031.

  • Use the current version going forward. If you've saved Sites or lists using the previous datasets, re-check capacity with the current datasets.

  • Need voltage limits at a specific POI? Request a Power Flow Study.

The prior withdrawal heat maps remain available for a transition period. If a value does not match what you saw previously, check the dataset name to confirm which version you have open. We recommend using the new datasets for all screening going forward.