Introduction to the Permitting layers
The Permitting layers tell you what a local code says about a technology, zoning district by zoning district, before you spend time on a site. Instead of reading an ordinance yourself, you can turn on a layer, click a district, and see the approval path, the setbacks, the size caps, and whether a ban or moratorium is in force.
There are four layers, one per technology: Solar permitting, Wind permitting, BESS permitting, and Data center permitting. Turn one on in the Permitting folder of the map legend, then click any district to open its Permitting popup. Every field you can see in that popup is defined below, in the order it appears.
Before you start
Four rules govern every value in the Permitting popup.
Every value describes the largest tier the code regulates. That means utility-scale or commercial-scale projects. Rules for rooftop solar, small wind, or home batteries never appear here.
Where a number varies, you see the most restrictive one. Setbacks and limits that differ by district or by condition are collapsed to the strictest case. Setback varies by zone tells you when that has happened.
Blank is not "no." A value of
falsemeans Paces looked where the rule would live and the rule is not there. A blank field means the code was silent or the source could not be confirmed, and blank fields are left out of the popup entirely.The data records what the code says, not what an official would decide. Every value is backed by a quoted passage from the ordinance.
The legend
Permitting status sets the color and pattern of each district. It is the district's Entitlement if the use is listed there, otherwise its Unlisted treatment.
Legend entry | Fill | What it means |
By right | Solid green | The use is named in this district and permitted without discretionary review. |
Special use | Solid yellow | The use is named and needs a discretionary approval: a special-use or conditional-use permit, a special exception, or an administrative conditional review. |
Prohibited | Solid red | The use is named and not permitted here. |
Unlisted: permissive default | Hatched green | The use is not named, but the code allows any use it does not expressly prohibit. |
Unlisted: similar use possible | Hatched yellow | The use is not named, but the code provides a pathway for similar or unlisted uses. |
Unlisted: prohibited | Hatched red | The use is not named, and the code treats unlisted uses as prohibited. |
Unlisted: silent | Hatched gray | The use is not named, and the code says nothing about unlisted uses. |
No fill | Transparent | A jurisdiction with no district scheme. See Generally allowed. |
Solid means the code names the technology in this district. Hatched means it does not, and the color shows what the code's unlisted-use rule does.
Note: Ban and Moratorium status do not change the fill - check them in the popup.
Jurisdiction fields
These fields describe the jurisdiction whose code was researched. They are the same for every district inside it.
State, County, and Subdivision name
Where the jurisdiction is. Subdivision name is the municipality or township for sub-county jurisdictions and is blank for counties.
FIPS and Subdivision FIPS
Census identifiers, for matching to other datasets. FIPS stands for Federal Information Processing Standards.
AHJ type
Values:county,city,town,township,charter_township,village,borough,parish
The kind of jurisdiction. Consolidated governments and Alaska boroughs show ascounty. Virginia independent cities show ascity.
Has zoning authority
Values:yes,no,partial
Whether this jurisdiction can approve, deny, or condition the land use itself, through zoning, use permitting, a siting ordinance, or a development-permit process that can stop or condition the use. A process limited to platting, drainage, or engineering review counts asno. A value ofpartialmeans another body, usually the state or the county, holds some of that authority over the same land. Note: a jurisdiction withnozoning authority has no district rows.
Who has zoning jurisdiction
Who holds land-use authority when it is not wholly this jurisdiction, for example the county plan commission. It can also carry a note that no one zones the land (e.g. Texas counties).
Unlisted use rule
Values:permissive_default,similar_use_possible,closed_enumeration_prohibited,silent
The jurisdiction-wide default for a use the code does not name. It uses the same values as Unlisted treatment, described below. Most districts inherit this value. A district differs only when its own provisions override it.
AHJ website and General zoning ordinance URL
The jurisdiction's main site and its governing zoning or land-use code.
Zoning contact phone and Zoning contact email
The zoning officer or planning office that handles land-use questions for this jurisdiction. This is the specific land-use contact, not a general clerk or 311 line.
District fields
These fields describe the specific zoning district you clicked, for the technology of the layer you have turned on.
Dev type
solar,wind,bess,data_center- The technology this district row describes. It matches the layer you are viewing.
District, District name, and District description - The district code exactly as printed in the ordinance, for example
A-1orI-2, its name, and a short statement of its purpose. For overlay and floating districts, the description says where the district can apply.
Overlay district - Shown only when true. The district is a supplemental layer applied on top of a base zoning district rather than a base district itself. A parcel has exactly one base district and may have several overlays.
Listed - Shown only when true. The technology, at its largest tier, is a named use for this district. That can be in the use table, in a use-category definition written to cover it, or in a provision that names it and settles where it belongs. A listing that covers only a smaller tier does not count.
Use term - The exact term under which the use is listed, as printed in the code, for example "Solar Energy System, Commercial" or "Utility, Major". Blank when the use is not listed.
Entitlement - For listed uses only. The most restrictive approval level the code applies to the use in this district.
by_rightis permitted without discretionary review. Use standards may still apply.special_useis any discretionary approval, whether heard by a board or reviewed administratively.prohibitedmeans not permitted here.
Unlisted treatment -
permissive_default,similar_use_possible,closed_enumeration_prohibited,silent
What the code does with a use it does not name in this district. Paces decides it in this order, taking the first that applies:permissive_default. The code's residual rule allows any use it does not expressly prohibit.similar_use_possible. The code provides a standing pathway for unlisted uses, such as an administrative similar-use determination or an open-ended "including but not limited to" category. A route plausibly exists. This is not a prediction that the route would succeed, and rezonings, text amendments, and variances do not count.closed_enumeration_prohibited. Not listed means prohibited, and the only recourse is a text amendment or a rezoning.silent. The code has no provision about unlisted uses at all. This is also the value for an overlay that does not mention the technology, in which case the base district governs.
Accessory only - Shown only when true. The technology is listed in this district only as an accessory use, with no provision for it as a primary use.
Rules for this technology
These fields apply jurisdiction-wide for the technology of the layer you have turned on. They are the same in every district of the jurisdiction.
Bans and moratoria
Ban - A permanent, jurisdiction-wide, express prohibition of the technology at its largest tier, even if smaller projects are still allowed. A size cap, a temporary moratorium, or a general "unlisted uses are prohibited" rule is not a ban. Those appear in Max overall size, Moratorium status, and Unlisted treatment instead.
Moratorium status - Whether an enacted moratorium on approvals for this technology is in force as of the research date. Expired, lapsed, proposed, or rumored moratoria show as
false. A utility interconnection pause is not a land-use moratorium. Paces checks meeting minutes, agendas, and local news for this field, not just the code.Moratorium start and Moratorium end -The effective date and the end date as written in the moratorium. Both are blank when no moratorium is in force. An active moratorium with a blank Moratorium end has no stated expiry.
Where the use is allowed
Primary use
true,false- Whether the technology is named as a primary, non-accessory use in at least one district of the jurisdiction. A use reachable only through a similar-use pathway does not count.Generally allowed - Appears only for jurisdictions with no district scheme, meaning no zoning or a permit-based regime with no use-by-district table.
no_regulationmeans no process gates the use.by_rightmeans a ministerial permit.special_usemeans a discretionary permit.prohibitedmeans the use is not permitted.Note: when district rows exist, this field is blank and the district's Entitlement or Unlisted treatment is what matters.
Restricts by zone - Whether the technology's permit status differs from district to district. A value of
falsemeans it is treated the same everywhere, including a uniform prohibition.Exclusionary zone - Whether the technology is prohibited in at least one overlay district, for example a scenic, historic, conservation, floodplain, or agricultural-preservation overlay. A base district that disallows the use is covered by Restricts by zone instead.
Setback varies by zone - Whether the technology's setbacks differ across districts. When
true, the setback numbers below are the strictest case, not a universal figure.Prime farmland restriction - Whether prime farmland or prime soils bear on where or whether a project can be approved. That includes a prohibition, required avoidance, a coverage cap tied to prime soils, a soil-class finding, a required agricultural-impact study, or a "shall be considered" siting directive. Paces records this broadly, so advisory language can set it to
true. Site restoration and decommissioning obligations do not count.
Size
Largest definition - How the code defines the largest tier of the technology it regulates, which is the tier every other field describes. Examples: solar "10 acres or more"; wind "more than 100 kW" (kilowatts); BESS "more than 1 MW (megawatts) for at least 1 hour".
Max overall size - The largest a single project may be, in the code's own unit, for example
400 acres,100 MW,2 turbines, or10% of parcel. Blank means no cap was found. Read it alongside Largest definition for size-sensitive questions.Restriction on total AHJ coverage - A cap on total development of this technology across the whole jurisdiction, for example
6,000 acresor1% of total acreage. This is most often seen for solar.
Setbacks
All setbacks are in feet and are the strictest value that applies to the largest tier. Each is named by what the distance is measured to.
Road setback - Distance from a road or right-of-way. Front-yard setbacks are recorded here.
Non-participating property line setback - Distance from the property line of a parcel that is not part of the project. Side-yard and rear-yard setbacks are recorded here.
Non-participating residence setback - Distance from a dwelling on property that is not part of the project.
Occupied structure setback - Distance from a non-residential occupied building such as a school, church, hospital, or place of assembly. This is a different receptor from a residence, so the two never share a value.
Noise, preemption, and sources
Sound limit - The enforceable noise limit that governs the technology, quoted with its units, its day and night regime, and its measurement point, for example "55 dBA at property line; 50 dBA night". dBA stands for A-weighted decibels. If the code has no technology-specific limit, this field holds the jurisdiction's general noise or nuisance standard, which may be qualitative, such as "no objectionable noise".
Preempted by - The state statute, if any, that removes or conditions the jurisdiction's authority over this technology at utility-scale, cited at the operative section, for example
IC 36-7-4-1109.5(b). This includes state siting preemption, opt-in state certification, state certificates that can override local ordinances, deemed-approval clocks, and limits on how long a local prohibition may last. Blank means none was recorded, not that none exists.Local law URL - The governing local instrument for this technology. That is a dedicated solar, wind, storage, or data-center ordinance if one exists, and otherwise the zoning code.
Data uploaded time - When Paces last refreshed this data from its research database.
Technology-specific fields
These fields appear only on their own technology layer.
Wind
Road setback formula, Property line setback formula, Residence setback formula, and Occupied structure setback formula Wind setbacks are often a multiple of turbine height. The numeric setback field holds the fixed distance or the code's stated minimum, and the matching formula field holds the multiplier, for example
1.1 × total system height. When the code gives only a multiplier, the number is blank and the formula is set. A rule reading "greater of 1.5× height or 500 ft" shows as500in the number and1.5 × heightin the formula.Maximum height The maximum height, in feet, for primary-use wind structures.
Shadow flicker limit The shadow-flicker limit for primary-use projects, for example "30 hours per year at any dwelling".
BESS
These four fields reflect requirements in the zoning or siting ordinance. A requirement that exists only in a separately adopted fire code, such as the IFC (International Fire Code) or NFPA 855 (National Fire Protection Association standard 855), is left blank.
UL 9540A required - The ordinance requires UL 9540A fire-test data.
Fire separation The required separation distance, in feet, between battery units or enclosures.
Emergency response plan required - An emergency response or hazard-mitigation plan is a condition of approval.
Chemistry restricted -The ordinance restricts which battery chemistries are permitted.
Data Center
Minimum lot size - A minimum lot size, in acres, set specifically for data centers or their use category. This is not the district's general minimum.
Substation required - Approval is conditioned on an on-site substation or a dedicated utility connection.
Backup generator fuel storage gallons - A cap on on-site backup-generator fuel storage.
Common questions
A field I expected is not in the popup
Blank fields are left out. Listed, Accessory only, and Overlay district appear only when they are true, so a missing Listed on a row that has an Unlisted treatment means the use is not listed there. Technology-specific fields appear only on their own layer.
Unlisted use rule and Unlisted treatment show different values
Unlisted use rule is the jurisdiction's default. Unlisted treatment is what this district's own provisions do. A county can prohibit unlisted uses generally while one district's use list carries its own similar-use clause. The district value is the one that applies to that district.
The district is green but there is a moratorium
The fill comes only from Entitlement or Unlisted treatment. A Ban or an active Moratorium status overrides what the district row says in practice, so always check those two fields.
A district exists in the code but is not on the map
Districts are drawn on Paces' digitized zoning map. A district that has not been digitized yet has no polygon to draw, even though its data exists. A jurisdiction with no district scheme is drawn as its whole boundary instead.
What does false mean versus a missing field?
A value of
falseis a finding: Paces searched the places such a rule would live and found none. A missing field means the code was silent or the source could not be confirmed. Never read a missing field as "no restriction."
Why doesn't the popup show the reasoning behind a value?
The Permitting popup carries the values only. The supporting notes, the researcher's rationale for each district, and the quoted ordinance passages are available through the Paces Agent.